Surface Mining / Lao PDR
Extended-reach anchor drilling for mine-slope stabilization in Laos.
02 / Application & working conditions
Built for this application.
A field case showing how reach, stable crawler positioning and flexible drilling angles support reinforcement work on exposed, fractured mine slopes.

- Rock type
- Fractured hard rock
- Hole diameter
- Ø76–180 mm reference range
- Hole depth
- Up to 10 m reference
- Horizontal lift height
- 20 m
- Drilling angle
- 0–90° side drilling
- Site access
- Uneven open-pit terrain
03 / Machine & solution
Machine configuration.
This base configuration was selected around the disclosed application and drilling requirements. Final project options are confirmed in the technical offer.

PVT-BS8 Anchor Drill Rig Mining Equipment
High-reach working envelope. A 20 m lift height and rotating platform support multiple anchor positions from fewer setups.
Self-contained drilling package. The integrated compressor reduces external equipment and hose routing around the working area.
- Equipment model
- PVT-BS8A high-reach anchor drill
- Engine power
- 228 kW
- Horizontal lift height
- 20 m
- Hole range
- Ø76–180 mm
- Maximum hole depth
- 10 m
- Side drilling
- 0–90°
- Integrated compressor
- 13 m³/min at 15 bar
- Platform
- 360° rotating crawler
04 / Project evidence & service
Equipment, delivery and field support.
Project, delivery and equipment views are identified transparently. Representative product imagery is used only where dedicated customer-site media has not been released.






Equipment Selection
Rig and drilling system matched to the disclosed application and conditions.
Pre-shipment Inspection
Configuration, key functions and shipment scope checked before release.
Delivery Support
Packing, transport and receiving requirements coordinated for the destination.
Technical Support
Operation, maintenance and parts-support scope aligned with the project.
05 / Field video
Watch the rig at work.
Original project footage is presented with user controls, no autoplay and a poster frame for lower-bandwidth connections.
06 / Result
Project result.
Only approved project facts are shown. Unverified penetration, output and fuel figures are not published.
Field equipment reached multiple reinforcement zones from stable setup positions.
The disclosed rig configuration matches the required reach and drilling-angle envelope.
Not published — no estimated penetration, output or fuel figures are presented as project results.
Planning a similar drilling project?
Get equipment recommendation.
Share the essential conditions and we will recommend an appropriate drill rig and drilling configuration.